Tesla M60 vs Tiger Lake U Xe Graphics G7

If you are going to buy a new graphics card and are choosing between Tesla M60 and Tiger Lake U Xe Graphics G7, there are a couple of things to consider. Cards with more VRAM in general perform better and allow you to play on higher graphics settings. Size also makes a difference. A model with a large heatsink can occupy up to three expansion slots on a motherboard. Be sure you have enough room in your PC case. When comparing GPUs with different architectures, more processing cores and even higher TFLOPS will not always translate to better performance. To help you decide which GPU you need, we have measured frame rates in a number of popular games. For more on how the Tesla M60 stacks up against Tiger Lake U Xe Graphics G7, check out specs charts below.

Tiger Lake U Xe Graphics G7 is a Laptop Graphics Card

Note: Tiger Lake U Xe Graphics G7 is only used in laptop graphics. It has lower GPU clock speed compared to the desktop variant, which results in lower power consumption, but also 10-30% lower gaming performance. Check available laptop models with Tiger Lake U Xe Graphics G7 here:

Main Specs

  Tesla M60 Tiger Lake U Xe Graphics G7
Power consumption (TDP) 300 Watt
Interface PCIe 3.0 x16
Supplementary power connectors 1x 8-pin
Memory type GDDR5 DDR4
Maximum RAM amount 8 GB
Display Connectors No outputs
  Check Price
  • Tesla M60 is used in Desktops, and Tiger Lake U Xe Graphics G7 - in Laptops.
  • Tesla M60 is build with Maxwell 2.0 architecture, and Tiger Lake U Xe Graphics G7 - with Gen. 11 Ice Lake.
  • Tesla M60 is manufactured by 28 nm process technology, and Tiger Lake U Xe Graphics G7 - by 10 nm process technology.

Game benchmarks

high / 1080p 35−40 12−14
ultra / 1080p 24−27 7−8
QHD / 1440p 18−20 1−2
4K / 2160p 10−11
low / 720p 60−65 30−33
medium / 1080p 45−50 16−18
The average gaming FPS of Tesla M60 in Assassin's Creed Odyssey is 171% more, than Tiger Lake U Xe Graphics G7.

Full Specs

  Tesla M60 Tiger Lake U Xe Graphics G7
Architecture Maxwell 2.0 Gen. 11 Ice Lake
Code name GM204 Tiger Lake Xe
Type Workstation Laptop
Release date 30 August 2015 15 August 2020
Pipelines 2048 96
Core clock speed 557 MHz
Boost Clock 1178 MHz
Transistor count 5,200 million
Manufacturing process technology 28 nm 10 nm
Texture fill rate 150.8
Floating-point performance 2x 4,833 gflops
Length 267 mm
Memory bus width 256 Bit
Memory clock speed 5012 MHz
Memory bandwidth 160.4 GB/s
Shared memory +
DirectX 12 (12_1) DirectX 12_1
Shader Model 6.4
OpenGL 4.6
OpenCL 1.2
Vulkan 1.1.126
CUDA 5.2
Bitcoin / BTC (SHA256) 432 Mh/s
Quick Sync +
  Check Price